Cardinal chains level 508/26/2023 The hope is that smaller reactors will be simpler and cheaper to build. Nuclear energy has traditionally taken a long time - and a lot of dollars - to build. What’s new is the interest in small commercial nuclear reactors. The University of Virginia had one in Charlottesville from 1960 to 1998. reported recently for Cardinal News, Virginia Tech maintained a small nuclear reactor on its Blacksburg campus from 1960 to 1985. We’ve also had small reactors for research purposes as Ralph Berrier Jr. If you’ve ever been to Virginia Beach, you’ve passed by a lot of small nuclear reactors without realizing it. Navy presently has 86 nuclear-powered vessels, including all 11 of our aircraft carriers - all of which were built in Newport News and six of which are homeported in Hampton Roads. The world’s first nuclear-powered aircraft carrier, the USS Enterprise, was commissioned at Newport News in 1961. The world’s first nuclear-powered submarine, the USS Nautilus, set sail from Groton, Connecticut, in 1954. Some background for those just joining us: We’ve had small nuclear reactors for a long time and many of those were built in Virginia. I can, though, describe how the prospect of SMRs has started to captivate a lot of imaginations long before a single one is ever deployed in the United States. The customary disclaimers apply here: I’m not here to advocate for or against nuclear energy. Glenn Youngkin, in particular, wants to add to Virginia’s fleet of energy generators - and which he and Southwest Virginia legislators would specifically like to see in Southwest. Nonetheless, the point is that here’s yet another example of the growing enthusiasm for small modular reactors, which Gov. That seems a long way out, although Purdue’s athletic department also has football games scheduled as far out as 20 - and they’re not planning as far ahead as Virginia Tech, which already has games booked for 2035 (at Alabama and home against South Carolina), 2036 (Notre Dame at home) and 2037 (at Ole Miss). This doesn’t mean a reactor will be built in West Lafayette, Indiana, anytime soon.That study recommended yet more study and, given the lengthy nature of getting a nuclear reactor licensed, the report said it might be the late 2030s before a reactor is operational.
0 Comments
Leave a Reply.AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |